2024-08-27 Page View:25612

On August 27th, CORNEX won the bid for China Electrical Equipment Group's 4GWh energy storage battery procurement project. The total scale of the centralized procurement project for energy storage batteries by CEE is 14. 54GWh, including 314Ah, 280Ah, 100Ah, 50Ah and other specifications of battery cells, divided into 4 sections and 11 packages. CORNEX (4. 01GWh), CATL (2 果冻传媒影视在线观看. 12GWh), Lishen (2. 12GWh), Great Power (1. 87GWh), Narada Power Sources (0. 99GWh), and HiTHIUM Energy Storage (3. 43GWh) have each won bids for eight separate contract packages in the centralized procurement of energy storage batteries.


en.jpg


CORNEX won the bid for this project with its great technical strength, rich project experience, and excellent product performance, which not only reflects its leading position in the field of energy storage batteries, but also demonstrates its strong ability to mass produce high-quality energy storage products. In the future, CORNEX will actively promote global energy transformation and sustainable development 果冻传媒影视资源.


"果冻传媒影视资源" Sales Tel+86 712-2595555
E-mail
"果冻传媒影视在线观看" AddressNO.1, Cornex Avenue, Linkong Economic Zone, Xiaogan, Hubei, China
Quick Links
Passenger Vehicles
Commercial Applications
Energy Storage